欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-4620-2011 Lessons Learned Standard Change Order Cost Proposals Format.pdf

    • 资源ID:1019463       资源大小:85.32KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-4620-2011 Lessons Learned Standard Change Order Cost Proposals Format.pdf

    1、Public Lessons Learned Entry: 4620 Lesson Info: Lesson Number: 4620 Submitting Organization: KSC Submitted by: Jenni Palmer Subject: Standard Change Order Cost Proposals Format Abstract: In the course of the NASA on-site management of the construction of the Ares I Mobile Launcher (ML) at Kennedy Sp

    2、ace Center (KSC), the change orders were numerous and tended to be technically complicated, due to the magnitude of the ML project ($140M). The NASA team dictated the use of a specific Excel format and requisite supporting data. This expedited review and facilitated negotiation. Cost proposal format

    3、 should be dictated as part of the contract. Description of Driving Event: A construction contractor on a NASA project is directed by the Contracting Officer to add scope (additional work) to the project; then the contractor submits their cost proposal for the added work to the Government. This cont

    4、ractors proposal is evaluated by the NASA construction management team and if there are differences of opinion, a negotiation is held to clarify scope and imbalances between the parties estimated costs. In the past, NASA/KSC has not typically directed the contractor to use any one type of standardiz

    5、ed format when submitting cost data for an authorized change. On smaller projects with few change orders, it has not been a problem to evaluate the change in whatever format the contractor wishes to use, as long as all the pertinent data has been included. In the course of the NASA on-site managemen

    6、t of the construction of the Ares I Mobile Launcher (ML) at Kennedy Space Center (KSC), the change orders were numerous and tended to be technically complicated, due to the magnitude of the ML project ($140M). The project schedule was also very tight. Turnaround time to get the change orders negotia

    7、ted and finalized was critical. Each of the subcontractors working under the prime used a different format. Some change order cost proposals being submitted contained seven or more independently formatted worksheets. Initial change order proposal requests from the contractor were being presented in

    8、different formats depending on which subcontractor was preparing the cost information. This made it very difficult for the evaluation team to follow, and much time was spent understanding what information was or wasnt included in the contractors figures. The NASA team dictated the use of a specific

    9、Excel format and requisite supporting data. This expedited review and facilitated negotiation. The prime contractor and subcontractors initially resisted but then fully endorsed the usage of standard formatting and suggested it be utilized on all construction change orders. Lesson(s) Learned: A stan

    10、dard change order proposal format allowed improved understanding of the scope of the work by both parties and resulted in an expedited and more amicable resolution to the change order negotiation. Recommendation(s): Cost proposal format should be dictated as part of the contract. Evidence of Recurre

    11、nce Control Effectiveness: N/A Documents Related to Lesson: N/A Mission Directorate(s): Exploration Systems Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Key Phrase(s): Program Management .Acquisition / procurement strategy and planning

    12、Program Management.Business processes Program Management.Configuration and data management Additional Info: Project: Constellation Approval Info: Approval Date: 2011-03-02 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-4620-2011 Lessons Learned Standard Change Order Cost Proposals Format.pdf)为本站会员(outsidejudge265)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开