欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-4416-2012 Critical System Maturity Requirements Critical System Analytic Model and Critical System Certification Proces.pdf

    • 资源ID:1019448       资源大小:87.33KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-4416-2012 Critical System Maturity Requirements Critical System Analytic Model and Critical System Certification Proces.pdf

    1、Public Lessons Learned Entry: 4416 Lesson Info: Lesson Number: 4416 Lesson Date: 2010-09-24 Submitting Organization: KSC Submitted by: John Hampton Subject: Critical System Maturity Requirements, Critical System Analytic Model, and Critical System Certification Process Abstract: It is important to e

    2、stablish the environment in which equipment is to operate prior to designing or specifying it. Once the design or specification is set, NASA should not forego certification testing as this may give rise to continuing costs over the life of the program. Description of Driving Event: The Shuttle progr

    3、ams original specification was that all flight hardware was to be rated to survive a 200k amp lightning strike. When it came to certification testing, the flight elements applied for and were granted waivers to these requirements. Its unclear whether they would have failed the certification testing

    4、or it was too expensive to accomplish. No testing of any kind was done. Thereafter, during the major portion of the vehicles operational life, there were no fact based criteria for accessing the vehicles flight worthiness in the wake of a direct or nearby lightning strike.Columbia Accident Investiga

    5、tion Board (CAIB) Report Lesson(s) Learned: It is obvious that skipping the qualification of the vehicle to in areas involving the natural environment will present reoccurring problems. In the case of failing to perform lightning certification, the potential to induce voltages and currents has resul

    6、ted in many uncertain situations where each design center has to decide from the available evidence whether or not the vehicle is flight worthy. This has been time consuming and has resulted in un-necessary testing and discussions. Many times the decision had to be made using data that was lacking c

    7、ompleteness or was inconclusive. Recommendation(s): When writing specifications, take into the account the environment that the equipment is to operate within and write sensible conservative specifications. Once the equipment is built, do not allow waivers to requirements that are derived from the n

    8、atural environment. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: N/A Mission Directorate(s): Space Operations Additional Key Phrase(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Electromagnetic Environment Elec

    9、tromagnetic Interference Technology Readiness Level Proprietary Technology Integration and Testing 1.Mission definition and planning 1.Planning of requirements verification processes 1.Level 0/1 Requirements 1.Program planning, development, and management 1.Crew Survival Systems Decision Support System Certification Process Operational Environment Additional Info: Project: Space Shuttle Program Approval Info: Approval Date: 2012-08-13 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-4416-2012 Critical System Maturity Requirements Critical System Analytic Model and Critical System Certification Proces.pdf)为本站会员(testyield361)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开