欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-2816-1990 Lessons Learned - Software Modification Verification.pdf

    • 资源ID:1019388       资源大小:21.02KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-2816-1990 Lessons Learned - Software Modification Verification.pdf

    1、Public Lessons Learned Entry: 2816 Lesson Info: Lesson Number: 2816 Lesson Date: 1990-05-10 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Software Modification Verification Abstract: On 24 April 1990, the launch of the Hubble Space Telescope, STS-31R, was held at T-31 seconds beca

    2、use the Main Propulsion System (MPS) liquid oxygen (LOX) outboard fill and drain valve (PV9) was not closed. The command to close the valve was blocked by Prerequisite Control Logic (PCL) and therefore never issued. A plan to override the PCL was conceived and concurrence was granted by the launch t

    3、eam. Once PV9 was successfully closed, the NASA Launch Director authorized resuming the countdown clock, and STS-31R was successfully launched. The PCL blocked the PV9 closed command because a deviation to the S1003 procedure required the LOX helium transfer line purge to be turned on at T-1:20. Thi

    4、s change was in response to a potential Launch Processing System (LPS) power failure resulting in an emergency drain to prevent vehicle damage. The procedural change was coordinated and signed by all the proper personnel but was not run against the math model because it was thought to be well unders

    5、tood. Description of Driving Event: As a result of a hardware failure in the KSC facility power system on 2 April 1990, it was realized that the potential existed for a total loss of the LPS. It was determined that a loss of LPS after T-31 seconds would result in unfavorable vehicle configuration: O

    6、verboard LOX bleed valve PV19 closed. This configuration requires that the LOX drain be established within 9 minutes or a catastrophic LOX feedline geyser could occur. Because of the LPS power loss, a normal LOX system drain could not be performed via hardwire safing switches. Specifically, the heli

    7、um transfer line purge could not be turned on prior to drain flow being initiated into the empty tail service mast because no hardwire safing switch for that purge existed. A plan to activate the purge at T-1:20 was agreed upon, and a procedural change was implemented to the S1003 procedure. Because

    8、 of late discovery of this issue, the new procedure was not verified against the math model. Lesson(s) Learned: All procedural changes to cryogenic loading procedures must be verified against the math model. Recommendation(s): Perform procedural verifications against software models prior to executi

    9、ng against hardware. Increase console teams training. Heightened awareness of software controls. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: N/A Mission Directorate(s): Exploration Systems Science Space Operations Aeronautics Research Provided by IHSNot for ResaleN

    10、o reproduction or networking permitted without license from IHS-,-,-Additional Key Phrase(s): 1.Ground support systems 1.Ground processing and manifesting 1.Planning of requirements verification processes 1.Launch support systems Additional Info: Project: Space Shuttle Program Approval Info: Approval Date: 2010-08-12 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-2816-1990 Lessons Learned - Software Modification Verification.pdf)为本站会员(刘芸)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开