欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1896-2008 Lessons Learned Functionality of Independent Product Teams.pdf

    • 资源ID:1019333       资源大小:14.60KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1896-2008 Lessons Learned Functionality of Independent Product Teams.pdf

    1、Lessons Learned Entry: 1896Lesson Info:a71 Lesson Number: 1896a71 Lesson Date: 2008-09-4a71 Submitting Organization: KSCa71 Submitted by: Chien Nguyena71 POC Name: Barbara Coxa71 POC Email: Barbara.Cox-1nasa.gova71 POC Phone: 321-476-4059Subject: Functionality of Independent Product Teams Abstract:

    2、Independent Product Teams with government, Air Force, contractor and subcontractor members provided a highly structured environment for teamwork to manage a huge contract allowing members to focus on mission. More training for customers on how to evaluate the contractor and a good definition of awar

    3、d fee criteria discriminators are required for success. Award fee evaluation inputs should include information on; a. Expectations (what the contract requires) b. Service received c. Consequence and/or impactDescription of Driving Event: The Cape Canaveral Spaceport Management Office used twenty-fiv

    4、e Independent Product Teams (IPTs) to manage the Joint Base Operations Support Contract (JBOSC) from 1998 to Sep 2008. These IPTs focused on individual areas of this huge contract teamed by government members of NASA-KSC, Air Force, contractor and subcontractor personnel. This was a huge responsibil

    5、ity, successful only because of the complete dedication of the members. Below is a breakdown of lessons learned by members of these teams recorded during their final meetings.Lesson(s) Learned: 1. The team structure was highly functional and consisted of the customer, contractor, subcontractors, and

    6、 Cape Canaveral Spaceport Management leadership. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2. The team employed a proactive approach and quick resolution of issues 3. Sub-groups of the IPT were used to resolve minor issues and members had the a

    7、uthority to act 4. The award fee evaluation spreadsheet for inputs was an excellent tool, but the following columns needed to be added: a. Expectations (what the contract requires) b. Service received c. Consequence and/or impact 5. Management changes caused excessive changes in processes 6. The eva

    8、luation was complicated to people outside the IPTs, for instance; a. It was not clear what it took to meet or exceed b. Disproportionate values were given to some issues c. Need to better define a plus versus minus in award fee 7. More training is needed for customers on how to evaluate the contract

    9、or and educate them on what to submitRecommendation(s): Integrated Product Teams are very useful and should be used for government and contractor groups. Training is needed for customers on how to evaluate the contractor and educate them on what to submit Award fee evaluation inputs should include i

    10、nformation on; a. Expectations (what the contract requires) b. Service received c. Consequence and/or impact Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Space OperationsProvided by IHSNot for ResaleNo reproduction or networking permitt

    11、ed without license from IHS-,-,-Additional Key Phrase(s): a71 Mission Operations and Ground Support Systems.Ground processing and manifestinga71 Additional Categories.Ground OperationsAdditional Info: a71 Project: Joint Program for NASA and USAF on Joint-Base Operations Support ContractApproval Info: a71 Approval Date: 2008-11-14a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1896-2008 Lessons Learned Functionality of Independent Product Teams.pdf)为本站会员(amazingpat195)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开