欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1793-2007 Lessons Learned - Project Management Misaligned Project Support Organizations.pdf

    • 资源ID:1019289       资源大小:15.69KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1793-2007 Lessons Learned - Project Management Misaligned Project Support Organizations.pdf

    1、Lessons Learned Entry: 1793Lesson Info:a71 Lesson Number: 1793a71 Lesson Date: 2007-6-15a71 Submitting Organization: ARCa71 Submitted by: Donald MendozaSubject: Project Management: Misaligned Project Support Organizations Abstract: Center organizations must be adequately aligned with the needs of th

    2、e projects they support. This is especially true for projects that are at the beginning of their life-cycle or at a critical milestone since inefficiencies and ineffectiveness at these junctures can propagate well into latter phases where they are significantly more difficult to correct or make up f

    3、or.Description of Driving Event: The Project was aimed at the developing and running a mission which would attempt to confirm either the existence or absence of water ice on one of the moons poles. It was conceived to be a relatively fast-paced and low-cost Project and therefore leveraged as much ex

    4、isting Agency and industry technology and experience as possible. In particular, the Project leveraged existing NASA systems by flying as a secondary payload onboard a vehicle launching a larger spacecraft intended to map the moons surface, its corporate partners spacecraft expertise, and the Center

    5、s experience with the Lunar Prospector mission. Thus, as the Projects approach to reduce its cost and schedule was technology and experience leveraging it planned to rely heavily on support from the various Center line organizations including those responsible for systems management, procurement, pe

    6、rsonnel, and acquisitions. Unfortunately, these organizations were not adequately aligned with this approach and the Project was forced to accomplish more “boot-strapping” than originally planned. However, the Projects experience during this time illuminated several opportunities which the Center ca

    7、n address to improve its project management capabilities.Lesson(s) Learned: 1. Support or line Organizations (SMO, Procurement, Acquisitions, etc.) are not adequately in-line with the requirements of fast paced projects, especially during their spool-up period. Provided by IHSNot for ResaleNo reprod

    8、uction or networking permitted without license from IHS-,-,-a. A line organizations timescale is much to long for critical items or services like procurements, document review/approval, export control, personnel actions, and logistics. Thus, the Project will have to devote much of its own time to be

    9、coming proficient on rarely used tools and in shepherding the work of people outside its organization. b. Some line organizations may be too academic or geared towards providing their domain expertise through consultation rather than Project specific practice. However, Projects of this nature benefi

    10、t more from “just-in time” hands on help rather than consultation. While this consultation may result in good advice, heavily resource constrained Projects just dont have the personnel to follow it up in a timely fashion. c. Most support organizations serve multiple projects and have their personnel

    11、 located together, often in a location that is not convenient or accessible to the projects. Thus, a project will be required to spend lots of its time traversing to and from its support offices and waiting for service amidst all the Centers other work. 2. The issues described above are exacerbated

    12、by the fact that the Center does not have an adequate mechanism to share and promulgate corporate knowledge or to capture it as people leave, thus each new project (and support staff) suffers unnecessarily with the same issues which plagued those who came before. Recommendation(s): 1. Centers should

    13、 adjust their processes such that line and project organizations are better able to coordinate their respective schedules, especially during the projects spool-up period, this includes: a. Adjusting the line organizations timescales or turn-around times such that they can provide their services in t

    14、ime to meet a Projects schedule. Thus, as a standard practice the Project should have a representative from each appropriate line organization (independent of any persons assigned to the project) review its schedule to ensure that their organization can meet it. b. Ensuring that, in addition to thei

    15、r consulting services that support organizations have the resources to provide their domain expertise to the projects specific tasks in times of crisis or high activity. c. Providing projects with dedicated and co-located support or as a minimum the establishment of a shared resource center with a m

    16、aster integrated schedule (integrated with that of all the Centers projects) in which multiple projects can get “just-in time” services. 2. Centers should establish an enterprise approach to project support such that the resources of all support services and offices can be coordinated via an integra

    17、ted master schedule. This schedule should address the long and short term delivery of support as well as the sustained and “just-in time” delivery of support. a. Critical to this Centerwide integration of services is a mechanism to share and promulgate corporate knowledge. Therefore, Centers should

    18、formalize a knowledge capture and dissemination system and ensure it is incorporated into appropriate employee training and development programs as well as into project planning tasks. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Evidence of Recur

    19、rence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Sciencea71 Exploration Systemsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Program Management.a71 Systems Engineering and Analysis.Additional Info: a71 Project: AllApproval Info: a71 Approval Date: 2008-08-07a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1793-2007 Lessons Learned - Project Management Misaligned Project Support Organizations.pdf)为本站会员(medalangle361)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开