欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf

    • 资源ID:1019262       资源大小:14.79KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf

    1、Lessons Learned Entry: 1721Lesson Info:a71 Lesson Number: 1721a71 Lesson Date: 2006-03-14a71 Submitting Organization: JSCa71 Submitted by: Ron MontagueSubject: Emergency Pre-planning System Abstract: A system of pre-start tasks ane emergency plannning ameliorated the effects of an arc blast to an em

    2、ployee.Description of Driving Event: An electrician suffered burns from an electrical arc/blast when a pre-existing condition in a power distribution panel ultimately led to a ground fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that

    3、 had penetrated conductor insulation. The response of local emergency resources to the mishap was exemplary, but would have been delayed if the injured worker had not just done his own safety task analysis just before the mishap. The safety task analysis included among other things locating fire ala

    4、rm pull boxes and extinguishers; who to call in case of an emergency; what hazards were in place in the work area; etc. This safety task analysis is routinely performed before each task to ensure that risks are minimized prior to start of work. Because the worker pulled the alarm box within ten seco

    5、nds after being injured, emergency response teams responded and were at the scene within 3 minutes of the event. Response was initiated before detectors triggered alarms at the Emergency Operations Center and the fire station. The employee was already showing signs of shock upon arrival of fire prot

    6、ection specialists who administered first aid until the paramedics arrived a couple minutes later. The patient was transported to a downtown hospital?s burn unit and arrived within 40 minutes of the emergency. At the same time first aid was being administered, additional fire protection specialists

    7、began to fight Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the small fire in the building. The fire was extinguished immediately with a dry chemical extinguisher and before the fire suppression system was triggered. Damage/loss of mission-critica

    8、l equipment and facilities was averted. The reported community standard for emergency response is for resources to arrive at the scene within 30 minutes of notification. Without a working fire suppression system in place, total building involvement would have occurred. The presence of onsite resourc

    9、es plus the pre-established response by the employee reduced response time to 3 minutes. Because everything was in place ? employee response, systems in place, and resources ready - the injured employee was stabilized rapidly and the damage incurred was restricted to the failed equipment.Lesson(s) L

    10、earned: Conducting pre-start job safety analyses and job hazard assessments ensures success in emergency situationsRecommendation(s): 1. Consider benchmarking the distribution of emergency response resources at JSC as a ?best practice? for all NASA centers.Evidence of Recurrence Control Effectivenes

    11、s: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Additional Categories.a71 Additional Categories.Emergency Preparednessa71 Additional Categories.Facilitiesa71 Additional Categories.Human Factorsa71 Additional Categories.Human Resources & Educationa71 Add

    12、itional Categories.Industrial OperationsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Additional Categories.Personal Protective Equipmenta71 Additional Categories.Policy & Planninga71 Additional Categories.Risk Management/Assessmenta71 Additional Categories.Safety & Mission AssuranceAdditional Info: a71 Project: N/AApproval Info: a71 Approval Date: 2006-06-30a71 Approval Name: tmasona71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf)为本站会员(terrorscript155)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开