欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1718-2004 Lessons Learned - Facilities Installation and Maintenance Records as Government Property.pdf

    • 资源ID:1019260       资源大小:14.92KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1718-2004 Lessons Learned - Facilities Installation and Maintenance Records as Government Property.pdf

    1、Lessons Learned Entry: 1718Lesson Info:a71 Lesson Number: 1718a71 Lesson Date: 2004-10-1a71 Submitting Organization: JSCa71 Submitted by: Ron Montaguea71 POC Name: Shelia Powella71 POC Email: shelia.k.powellnasa.gova71 POC Phone: 281-483-3142Subject: Facilities Installation and Maintenance Records a

    2、s Government Property Abstract: Loss of maintenance schedules during contract turnover led to omission of panel from inspection schedule, increasing risk.Description of Driving Event: An electrician suffered burns from an electrical arc/blast when a pre-existing condition in a power distribution pan

    3、el ultimately led to a ground fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that had penetrated conductor insulation. A contributing factor to this incident was the lack of work access history. This was tracked ultimately to the loss

    4、 of maintenance data during support contract turnover. Maintenance schedules and data were not routinely obtained by the Government at contract termination. While JSC has been in existence since the mid-1960s, only the past two and a half years of maintenance history were readily available. The only

    5、 record of past testing of the breaker was a test certification sticker from the time of installation ten years before the mishap. Records were not available to indicate preventative maintenance had been performed on this breaker. During a ten-year period, there were two occasions when the cables wo

    6、uld have been disconnected from the breaker, so that the main breaker could have been removed for testing. As part of these Two opportunities for maintenance, the incoming cables where the fault occurred would have been recognized and corrected (moved and/or repositioned), increasing the likelihood

    7、that any insulation damage would have been prevented. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Specific transformer maintenance records indicate that five-year preventative maintenance was performed 14 months before the mishap on the primary b

    8、uilding transformer. However, there was no work order was issued to perform maintenance on the main breaker of the power distribution panel. Lesson(s) Learned: Key as-built and maintenance records must be generated and managed as Government property.Recommendation(s): 1. Cradle to grave approaches m

    9、ust be implemented to ensure that historical maintenance records are accurate and complete. 2. All installation and maintenance documentation should be held in a repository maintained by the contractor and owned by the government. 3. Follow-on contractors must have compatible information systems wit

    10、h electronic data transfer capability. Evidence of Recurrence Control Effectiveness: Data is now identified in current and successor contract as government property.Documents Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Sciencea71 Exploration Systemsa71 Aeronautics ResearchA

    11、dditional Key Phrase(s): a71 Program Management.a71 Missions and Systems Requirements Definition.a71 Missions and Systems Requirements Definition.Configuration control and data managementa71 Systems Engineering and Analysis.a71 Systems Engineering and Analysis.Long term sustainability and maintenanc

    12、e planninga71 Manufacturing and Assemblya71 Safety and Mission Assurance.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Safety and Mission Assurance.Early requirements and standards definitiona71 Safety and Mission Assurance.Maintenancea71 Safet

    13、y and Mission Assurance.Qualitya71 Additional Categories.a71 Additional Categories.Configuration Managementa71 Additional Categories.Energya71 Additional Categories.Facilitiesa71 Additional Categories.Industrial OperationsAdditional Info: a71 Project: N/AApproval Info: a71 Approval Date: 2006-12-06a71 Approval Name: ghendersona71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1718-2004 Lessons Learned - Facilities Installation and Maintenance Records as Government Property.pdf)为本站会员(brainfellow396)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开