欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1605-2005 Lessons Learned Acquisition Management Using Competitive Acquisition Mechanisms to Ensure the Quality and Competence of the Contractor.pdf

    • 资源ID:1019228       资源大小:14.40KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1605-2005 Lessons Learned Acquisition Management Using Competitive Acquisition Mechanisms to Ensure the Quality and Competence of the Contractor.pdf

    1、Lessons Learned Entry: 1605Lesson Info:a71 Lesson Number: 1605a71 Lesson Date: 2005-08-11a71 Submitting Organization: ARCa71 Submitted by: Donald R. Mendozaa71 Authored by: Donald R. MendozaSubject: Acquisition Management: Using Competitive Acquisition Mechanisms to Ensure the Quality and Competence

    2、 of the Contractor Abstract: The incentives for private industry to develop one of a kind space vehicles does not encourage them to use their top resources. Description of Driving Event: Over the span of several decades, an individual involved in many space missions, including several X-vehicle proj

    3、ects, has observed that private industry contractors often do not assign their top team to work on this type of NASA project. For industry, a space vehicle related contract is often a one of a kind project without the potential for repeat revenue. Also, as each of the contractors projects must compe

    4、te for the companys limited resources the other parts of the contractors business that represent its major streams of income (such as commercial aviation or military contracts) will have priority over NASA projects. Lesson(s) Learned: 1. If private industry does not have an incentive to put their be

    5、st people on a project, they wont.2. Without competition, contractors rely more on their existing science and technology and tend to be less innovative. a. This drives them toward design by analogy and the analogies may not be appropriate for space flight. b. Fly-off competitions give the Government

    6、 a good preview of the contractors proposed solution set and reduce risk. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.Recommendation(s): 1. All contractors scheduled to work on significant missions (those having a high dollar, risk, and/or publi

    7、c exposure) should be chosen through a competitive mechanism.2. Contractors responsible for developing an entire flight vehicle should be chosen through a fly-off. a. The project budget and schedule should accommodate a fly-off. b. The project plan should include independent oversight and review tea

    8、ms (a separate team assigned to each competitor) to interface with the competitive fly-off teams such that the final selections objectivity is maximized. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NPG 7120.5Mission Directorate(s): a72 Exploration Systemsa72 Science

    9、a72 Aeronautics Researcha72 Space OperationsAdditional Key Phrase(s): a72 Procurementa72 Small Business & Industrial Relationsa72 Program and Project Managementa72 Risk Management/AssessmentAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2006-04-18a71 Approval Name: dkruhma71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1605-2005 Lessons Learned Acquisition Management Using Competitive Acquisition Mechanisms to Ensure the Quality and Competence of the Contractor.pdf)为本站会员(unhappyhay135)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开