    REG NASA-LLIS-1564--2005 Lessons Learned Management Reviews Reporting and Technical Publications.pdf

    • 资源ID:1019187       资源大小:15.35KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1564--2005 Lessons Learned Management Reviews Reporting and Technical Publications.pdf

    1、Lessons Learned Entry: 1564Lesson Info:a71 Lesson Number: 1564a71 Lesson Date: 2005-01-01a71 Submitting Organization: ARCa71 Submitted by: Ronald C. Winterlina71 Authored by: Ronald C. WinterlinSubject: Management Reviews, Reporting and Technical Publications Abstract: A. Reviews: General Feedback R

    2、eceived From All Levels of Project Participants- There are too many reviews without clear definition of their purpose. As a result, reviews tended to overlap in their charters and often provided conflicting recommendations. Those involved in projects would be more motivated to support reviews if the

    3、y could see and experience distinct and valuable purposes that each review served. Independent review committees are not slowed (or do not take) adequate review time to understand the projects work, accomplishments, etc. and alignment with schedule and budget. As a result, many of the findings are i

    4、ncorrect or misleading as a result of misunderstandings or lack of knowledge about the project. B. Reporting: General Feedback Received - Too much disconnected upward reporting with little downward direction where the Program and/or Headquarters express direct interest or understanding in the work o

    5、f the project and helping to make it successful. AATT spent a lot of time and resources dealing with high-level issues throughout the life of the project. C. Technical Publications: The AATT Project Office made a special point to request and remind technical and sub-project managers that project rec

    6、ognition be appropriately documented in technical publications. This was a recurring problem throughout the 9-year life of the project. Description of Driving Event: Not Applicable Lesson(s) Learned: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-To

    7、o many reviews and reports that often times are repetitive and redundant providing the same information in different formats to different managers and teams, is costly in time, resources and moral. Every minute taken to put together and prepare huge packages of information that does not seem to be r

    8、ead and/or understood, takes away from a managers time and resources to assure the work of the project is successfully accomplished. Recommendation(s): A. It is recommended that there be fewer independent reviews, each with more time allotted to the project under review. There should be adequate tim

    9、e provided for discussion of the draft findings with the project manager, for a feedback loop that may lead to the committee modifying or refining its findings. Related to the above is up-front accurate communication to the projects exactly what the reviewer wants covered in terms of content. Too of

    10、ten AATT Project personnel were trying to determine what the reviewers wanted to see and hear. A reasonable and practical amount of format/content standardization would be helpful in preventing waste of time and having to scramble to get what the review committee decides it really wants to see on si

    11、te during the review itself. B. The obvious ideal reporting scenario is one that minimizes duplicative, redundant and multiple ways of providing the same information. A single Agency-wide reporting/information system should be developed and carefully thought out with the input of those having to pro

    12、vide the information. Project managers should only have to deal with this kind of thing once a month (at most) and it should suffice for all organizations and levels of management including Program Management Councils. The only thing that might be different is the level of detail, but in no case sho

    13、uld detailed project level information be required that is not really necessary for upper level managers to have. This becomes micro-management at its worst and can result in inefficient waste of scarce resources and time. Project managers usually end up spending valuable time away from managing the

    14、ir projects in order to answer questions and explain to those not knowledgeable or involved in the specific needsand day-to-day operations of the projects work. C. The AATT Project recommends that project recognition in publications be brought up and made a written policy to all involved individuals

    15、 and managers from the very beginning. The appropriate standards, including place and format should be discussed and agreed to as part of this policy arrangement. The AATT Project also recommends that future projects have a common process and format for technical documents to ensure easy retrieval f

    16、rom a database. A simple summary sheet and key words similar tot the Report Documentation Page, as specified in NASA Publications Guide for Authors, NASA/SP -1999-7602, November 1999, is proposed. Evidence of Recurrence Control Effectiveness: Provided by IHSNot for ResaleNo reproduction or networkin

    17、g permitted without license from IHS-,-,-Not Applicable Documents Related to Lesson: Not Applicable Mission Directorate(s): N/AAdditional Key Phrase(s): a71 Independent Verification and Validationa71 Policy & Planninga71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Organization: ARCProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1564--2005 Lessons Learned Management Reviews Reporting and Technical Publications.pdf)为本站会员(postpastor181)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开