欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1528--2004 Lessons Learned - Next Generation Launch Technology (NGLT) Centralized Standardized Resources Integration is Critical to Success.pdf

    • 资源ID:1019166       资源大小:13.25KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1528--2004 Lessons Learned - Next Generation Launch Technology (NGLT) Centralized Standardized Resources Integration is Critical to Success.pdf

    1、Lessons Learned Entry: 1528Lesson Info:a71 Lesson Number: 1528a71 Lesson Date: 2004-07-01a71 Submitting Organization: MSFCa71 Submitted by: Donald DugalSubject: Next Generation Launch Technology (NGLT)/Centralized, Standardized Resources Integration is Critical to Success Abstract: Budget errors, om

    2、issions, and inconsistencies during formulation, coupled with the need for a focal point to respond to and coordinate with Headquarters Management and Center Chief Financial Office (CFO) personnel. Programs should establish a central resources integration office and baseline the budget as quickly as

    3、 possible, using a formal mechanism for tracking and approving changes (e.g., NGLT Program Requirements Control Board (PRCB). Description of Driving Event: Budget errors, omissions, and inconsistencies during formulation, coupled with the need for a focal point to respond to and coordinate with Head

    4、quarters Management and Center Chief Financial Office (CFO) personnel, were driving events. Complicating factors were introduced into the current resource environment as a result of the implementation of full-cost accounting and the IFM System. There was also a constant stream of questions and reque

    5、sts for budget information.Lesson(s) Learned: It is important to establish a central program integration team and business staff as early in the formulation phase as possible. Having a program integration team as a single focal point for Headquarters and the Centers was critical. NGLT utilized a sin

    6、gle point of contact for sending all NGLT guideline change requests to Headquarters. This allowed the program integration office to field questions and inquiries from Headquarters and Centers. It also gave the Program Office the ability to handle questions and inquiries from a multitude of sources,

    7、thus insulating the project managers from unnecessary actions.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Recommendation(s): Programs should establish a central resources integration office and baseline the budget as quickly as possible, using a

    8、formal mechanism for tracking and approving changes (e.g., NGLT Program Requirements Control Board (PRCB). Detailed example: annotate budget spreadsheets with full configuration-control information, including a revision log). Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Less

    9、on: N/AMission Directorate(s): a71 Exploration Systemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 Financial Managementa71 Policy & Planninga71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Date: 2005-07-19a71 Approval Name: Lisa Carra71 Approval Organization: MSFCa71 Approval Phone Number: 256-544-2544Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1528--2004 Lessons Learned - Next Generation Launch Technology (NGLT) Centralized Standardized Resources Integration is Critical to Success.pdf)为本站会员(sofeeling205)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开