    REG NASA-LLIS-1527--2004 Lessons Learned - Next Generation Launch Technology (NGLT) Clearly Establish Reserves Schedule Margin and Spending Profile Early.pdf

    • 资源ID:1019165       资源大小:13.26KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1527--2004 Lessons Learned - Next Generation Launch Technology (NGLT) Clearly Establish Reserves Schedule Margin and Spending Profile Early.pdf

    1、Lessons Learned Entry: 1527Lesson Info:a71 Lesson Number: 1527a71 Lesson Date: 2004-07-01a71 Submitting Organization: MSFCa71 Submitted by: Donald DugalSubject: Next Generation Launch Technology (NGLT)/Clearly Establish Reserves, Schedule Margin, and Spending Profile Early Abstract: The X-43C Projec

    2、t budget and milestones were established well ahead of detailed cost and schedule analysis. Per Office of Aerospace Technology (OAT) policy at that time, no budget reserves or schedule margins were allowed. As project cost and schedule requirements grew, the only choice was to slip the first flight.

    3、 The original spending profile was also not compatible with efficient procurement of flight hardware. Programs should establish preliminary project budgets with adequate reserves and schedule margin adjusting budget and spending profiles as better information is developed. Description of Driving Eve

    4、nt: The X-43C Project budget and milestones were established well ahead of detailed cost and schedule analysis. Per Office of Aerospace Technology (OAT) policy at that time, no budget reserves or schedule margins were allowed. As project cost and schedule requirements grew, the only choice was to sl

    5、ip the first flight. The original spending profile was also not compatible with efficient procurement of flight hardware. Inability to adjust the spending profile forced the project to rearrange cost elements to match the profile, adding risk and extending the schedule. Lack of effective reserves, c

    6、omplicated by OAT 1-year spending metrics, exacerbated the problem.Lesson(s) Learned: Firm budgets should not be established until sound cost and schedule estimates have been developed. Funding and schedule reserves should be provided and managed at the project level. Funds appropriated as 2-year mo

    7、ney should be spent as 2-year money. Funds from the first year can be held in reserve and rolled into the second year for immediate spending. This would establish new reserves Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-in current year that can b

    8、e rolled into the third year, and so on. Overall funding, including reserves, should be consistent with project life-cycle costs, accounting for schedule margins.Recommendation(s): Programs should establish preliminary project budgets with adequate reserves and schedule margin adjusting budget and s

    9、pending profiles as better information is developed. Programs should allow rollover of unspent first-year reserve funds into the next year. The program should track and reclaim unspent reserves if they accumulate to excess. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson

    10、: N/AMission Directorate(s): a71 Exploration Systemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 Financial Managementa71 Policy & Planninga71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Date: 2005-07-19a71 Approval Name: Lisa Carra71 Approval Organization: MSFCa71 Approval Phone Number: 256-544-2544Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1527--2004 Lessons Learned - Next Generation Launch Technology (NGLT) Clearly Establish Reserves Schedule Margin and Spending Profile Early.pdf)为本站会员(testyield361)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开