欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1509--2003 Lessons Learned - Orbital Space Plane - Engineers as Smart Buyers.pdf

    • 资源ID:1019147       资源大小:15.17KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1509--2003 Lessons Learned - Orbital Space Plane - Engineers as Smart Buyers.pdf

    1、Lessons Learned Entry: 1509Lesson Info:a71 Lesson Number: 1509a71 Lesson Date: 2003-07-01a71 Submitting Organization: MSFCa71 Submitted by: Lisa CarrSubject: Orbital Space Plane - Engineers as Smart Buyers Abstract: The Orbital Space Plane (OSP) Program started up the learning curve early by creatin

    2、g the Acquisition Management Office (AMO) specifically for developing the acquisition strategy, Request For Proposal (RFP) development, and Source Evaluation Board (SEB) support. AMO brought our procurement specialists in at the beginning, trained in advanced procurement methods, benchmarked other s

    3、uccesses, and included the contractors in the RFP development. Plan how you buy as carefully as what you want to buy Description of Driving Event: AMO brought our procurement specialists in at the beginning, trained in advanced procurement methods, benchmarked other successes, and included the contr

    4、actors in the RFP development.Lesson(s) Learned: NASA generally procures major developments years apart rather than months apart. OSP started up the learning curve early by creating the Acquisition Management Office (AMO) specifically for developing the acquisition strategy, Request For Proposal (RF

    5、P) development, and Source Evaluation Board (SEB) support. AMO brought our procurement specialists in at the beginning, trained in advanced procurement methods, benchmarked other successes, and included the contractors in the RFP development.Additionally:a. Contract Modification Burdens. It can take

    6、 considerable time and resources to modify contracts or create extensions in response to program schedule and budget changes.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b. Transition from Development to Operations. During development of the Desig

    7、n and Development RFP, there was much discussion concerning when and how to transition to an operational system to ensure appropriate attention to the transition and to ensure flexibility for the government.c. Acquisition Management Office. OSP started up the acquisition learning curve early by crea

    8、ting the Acquisition Management Office (AMO) specifically for developing the acquisition strategy, building the RFP, and organizing and supporting the SEB. It would have been beneficial for other personnel from the OSP Program to have been part of the training so as to understand how to effectively

    9、implement the strategy into the transition to the development phase of the program.d. Acquisition Training. A training regimen was instituted very early in a programs life for acquisition, procurement, and Source Evaluation Boards. This effort should begin with research and benchmarking of NASA and

    10、DoD best practices.e. Competitive Contractor Feedback. Government/contractor meetings that involved all bidders were of almost no value, because the contractors would not communicate openly. Conversely, the prospective bidders communicated freely in one-on-one government/contractor sessions, and the

    11、se sessions were very effective.f. Coalition for Acquisition. RFP development was a successful collaboration of engineers, managers, and procurement specialists from across the country. Co-location was the most efficient setting for efficient document development, but, early involvement through dist

    12、ance collaboration enhanced the co-location meetings. Distance collaboration was implemented using a secure, web-based IT tool Projectlink. Contractor participation in RFP development resulted in a quality product where quality is defined as a clear articulation of the work to be contracted by the g

    13、overnment and a clear understanding of government intent by the bidders.g. Ongoing Work Leading to Proposal. The OSP program and the SEB worked very hard at creating a linear relationship between the architecture work being conducted and the proposal to be delivered in response to the full scale dev

    14、elopment RFP. This work was incomplete. The contractors had been reporting at least one design iteration behind in their deliverables as late as SDR. The OSP RFP emphasized contractor performance at SDR. This emphasis may have been in error.Recommendation(s): Plan how you buy as carefully as what yo

    15、u want to buy. It is beneficial for other personnel from the programs to be part of Acquisition Management training so as to understand how to effectively implement the strategy into the transition to the development phase of programs. Acquisition training should begin with research and benchmarking

    16、 of NASA and DoD best practices. Release RFP on schedule, the proposals and set agreed-to requirements and design concept baselines. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Evidence of Recurrence Control Effectiveness: N/ADocuments Related to

    17、 Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Procurement Small Business & Industrial RelationsAdditional Info: Approval Info: a71 Approval Date: 2005-04-12a71 Approval Name: Lisa Carra71 Approval Organization: MSFCa71 Approval Phone Number: 256-544-2544Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1509--2003 Lessons Learned - Orbital Space Plane - Engineers as Smart Buyers.pdf)为本站会员(ideacase155)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!