欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1504-2003 Lessons Learned - Orbital Space Plane - Technical Rigor& Integrity.pdf

    • 资源ID:1019142       资源大小:14.86KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1504-2003 Lessons Learned - Orbital Space Plane - Technical Rigor& Integrity.pdf

    1、Lessons Learned Entry: 1504Lesson Info:a71 Lesson Number: 1504a71 Lesson Date: 2003-07-01a71 Submitting Organization: MSFCa71 Submitted by: Lisa CarrSubject: Orbital Space Plane - Technical Rigor & Integrity Abstract: The Orbital Space Plane (OSP) Program technical content and review standards were

    2、diluted as the program accelerated and budgets adjusted. Altered plans produce altered results. Address technical excellence and the increase in program risk when modifying the program to meet revisions to schedules and budgets. Description of Driving Event: Technical products were compromised by ab

    3、andoning established processes, tools, and standards of performance.Lesson(s) Learned: The OSP Program technical content and review standards were diluted as the program accelerated and budgets adjusted. Technical products were compromised by abandoning established processes, tools, and standards of

    4、 performance. The intent was to catch up later, but the bow wave was growing.Additionally: a. Milestone Review Deliverables OSP milestone review deliverables did not effectively communicate the work performed by the contractors to the reviewers. Contractor requirements traceability matrices did not

    5、fully address the issues of requirement rationale and allocation. The number of documents delivered and the lack of clear organization for traceability of requirements hampered the milestone (SRR, SDR) review process.b. Life Cycle Cost (LCC) Estimate Requirements OSP requirements for LCC estimates w

    6、ere not clearly defined. Contractors were asked to minimize LCC, but were constrained by a lack of Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-information on government facilities and government touch labor. Additionally, launch vehicle informati

    7、on was provided at the “service” level in order to maintain dual vehicle compatibility.c. Synchronize Development Requirement development, analyses, and system design activities were not synchronized. No system design activity was integrating size, weight, volume, surface area, power, cabling, tubin

    8、g, line layout, acoustic noise, induced environments, maintainability, life-cycle cost, etc.d. Review Integrity The System Requirements Review (SRR) was successfully held according to the schedule, yet a large part of the contractor submitted documentation was de-emphasized by the Program, and there

    9、 was little or no feedback to the initiators on the comments and Review Item Discrepancies (RIDs) submitted on the documents that were reviewed. Only Program (government) developed documentation was reviewed for the success criteria. Recommendation(s): Altered plans produce altered results. Address

    10、technical excellence and the increase in program risk when modifying the program to meet revisions to schedules and budgets. A fully defined requirements rationale table should provide information during a review to determine if the top level system design meets the system requirements. NASA should

    11、specify contractor document formats such that the information will allow for a timely, efficient and thorough review process.It is apparent that the greater the schedule pressure, the more important it is to establish, follow, and enforce NASA and contractor Systems Engineering Management Plans. Pla

    12、ns should be developed to catch-up to normally accepted review levels through the use of Interim Design Reviews. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key

    13、Phrase(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Administration/Organizationa71 Policy & Planninga71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Date: 2005-04-01a71 Approval Name: Lisa Carra71 Approval Organization: MSFCa71 Approval Phone Number: 256-544-2544Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1504-2003 Lessons Learned - Orbital Space Plane - Technical Rigor& Integrity.pdf)为本站会员(hopesteam270)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开