    REG NASA-LLIS-1432--1989 Lessons Learned - 8-Foot High Temperature Tunnel Mishap (1989).pdf

    • 资源ID:1019071       资源大小:13.08KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1432--1989 Lessons Learned - 8-Foot High Temperature Tunnel Mishap (1989).pdf

    1、Lessons Learned Entry: 1432Lesson Info:a71 Lesson Number: 1432a71 Lesson Date: 1989-11-20a71 Submitting Organization: LARCa71 Submitted by: Grant WatsonSubject: 8-Foot High Temperature Tunnel Mishap (1989) Abstract: Mishap while preparing to perform pneumatic flushing of debris from high pressure ai

    2、r lines in the 8-Foot High Temperature Tunnel (8HTT).Description of Driving Event: A mishap occurred at the 8HTT when a team of construction contractor personnel was preparing to perform a pneumatic flushing of debris from high pressure air lines by use of a low pressure, high velocity air. The blan

    3、k flange was removed from air lines perceived to have been un-pressurized. Removal of the flange, under pressure, resulted in serious injury to two of the personnel involved in the operation.Lesson(s) Learned: There were formal approved procedures which were to control this activity. If they had bee

    4、n followed, the accident could have been prevented. The procedures were written so as to ensure that the line was un-pressurized when the blank flanges were removed and that the flushing air source was not attached to the system unless the flanges were already removed. However, a failed valve and th

    5、e use of an alternative source for the air apply allowed this mishap to occur. The new configuration used a larger volume air source which was not isolated prior to flange removal. The configuration also allowed a single order failure to pressurize the line upstream of the blank flange.Recommendatio

    6、n(s): Survey your facility to verify that vents are present upstream of blank flanges used within your research systems/apparatus. Procedures dealing with the removal of these blank flanges must require Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,

    7、-verification of the venting of any such system to atmospheric pressure prior to flange removal. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phras

    8、e(s): a71 Accident Investigationa71 Facilitiesa71 Hardwarea71 Human Factorsa71 Mishap Reportinga71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2004-06-04a71 Approval Name: Leslie Johnsona71 Approval Organization: LARCa71 Approval Phone Number: 757-864-9409Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1432--1989 Lessons Learned - 8-Foot High Temperature Tunnel Mishap (1989).pdf)为本站会员(李朗)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开