欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1399-2003 Lessons Learned Program and Project Management Center-to-Center Relations.pdf

    • 资源ID:1019038       资源大小:15.08KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1399-2003 Lessons Learned Program and Project Management Center-to-Center Relations.pdf

    1、Lessons Learned Entry: 1399Lesson Info:a71 Lesson Number: 1399a71 Lesson Date: 2003-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. MendozaSubject: Program and Project Management: Center-to-Center Relations Abstract: All projects involving multiple Centers require diplomacy and sens

    2、itivity to human relations in order to overcome Center-to-Center issues that may otherwise undermine the projects success.Description of Driving Event: The Project, whose main objective was to reduce human error caused incidents and accidents in aviation, was part of a Program managed out of a diffe

    3、rent Center. Due to historical and existing rivalries, competition, and cultural differences between the Centers, the Project Manager (PM) took several steps to ensure that the Project maintained an affable and effective relationship with the Program Office. The steps included to cultivate the Cente

    4、r-to Center relationship were key personnel selections, funding choices, face-to-face meetings, frequent communications, and basic bridge building activities.References: none Additional Key Words: multiple centers, competition, communication, conflict.Lesson(s) Learned: All projects involving multip

    5、le Centers require diplomacy and sensitivity to human relations in order to overcome Center-to-Center issues that may otherwise undermine the projects success. In particular, the following should be considered: 1. A Project candidates relationships with and altitudes towards non-home Center personne

    6、l, processes, and cultures may be as significant as their technical capabilities. Project members Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-with antagonistic views toward other Centers can undermine the success of the Project.2. In order to dem

    7、onstrate and strengthen close ties with other Centers, it may be preferential, if not necessary, to direct some Project funding and key responsibilities to the partner Centers. This allocation of resources may not be understood or appreciated at the PMs home Center, therefore an effort should be mad

    8、e to highlight and communicate the best interests of the Project.3. Maintaining lines of communication (often times on a daily basis) with the Program office played a significant role in allowing the PM to overcome much of the existing Center-to-Center inertia. This healthy relationship helped to se

    9、cure Project resources during times when the Program was forced to descope and/or re-allocate resources among its several projects.Recommendation(s): An important aspect of project management includes building and maintaining mutually supportive relationships between all stakeholders. As the Agency

    10、has a long and storied history with many chapters associated with one Center or another, the natural tendency towards preserving this atmosphere of excellence can lead to competition and rivalries. Therefore, it is essential that all projects involving multiple Centers consider how this atmosphere c

    11、an help or hinder its success. In particular, project planning and implementation should include: 1. Team building exercises, face-to-face meetings, and frequently scheduled communications with all Center-to-Center principals.2. Tactical and strategic placement of personnel having significant commun

    12、ications with their non-home Center counterparts. These people should be able to look past historical differences and act in the best interest of the Project.3. Placing resources with those who have the most potential to contribute to the Projects goals regardless of their home Center. In addition r

    13、ecognition and rewards for excellence must not be biased towards one Center over another.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NPG 7120.5Mission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space OperationsProvided by IHSNot for ResaleNo reproduction

    14、or networking permitted without license from IHS-,-,-a71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 External Relationsa71 Policy & Planninga71 Program and Project Managementa71 Risk Management/AssessmentAdditional Info: Approval Info: a71 Approval Date: 2004-05-20a71 Approval Name: Andrew Hockera71 Approval Organization: ARCa71 Approval Phone Number: 650-604-4120Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1399-2003 Lessons Learned Program and Project Management Center-to-Center Relations.pdf)为本站会员(explodesoak291)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开