欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf

    • 资源ID:1018927       资源大小:15.06KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf

    1、Lessons Learned Entry: 1288Lesson Info:a71 Lesson Number: 1288a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ M. SumichSubject: Cost/schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundanc

    2、y Description of Driving Event: In order to minimize cost and schedule, the project, after a trade-off analysis, decided to build two fully functional test vehicles as opposed to one with built in redundancy (note: those items deemed critical to safe operation were redundant). The test vehicles were

    3、 of identical design but manufactured in sequence. Thus, while test vehicle number one was being flight tested, test vehicle number two was being built. The primary drivers for this approach were that the test vehicle was to be unmanned, have an emergency recovery parachute, and be operated in a ver

    4、y controlled and unpopulated area. The risk of losing one vehicle was minimized by the imposition of these stringent test flight constraints. While it was the projects intention to complete the second vehicle as if it were the first and only, its main purpose was for risk reduction (the projects suc

    5、cess meant vehicle number two was tested through ground taxi only). The second vehicle was also viewed as a source of parts for vehicle number one.Lesson(s) Learned: The approach to risk reduction mentioned above is credited with contributing significantly to the projects success, specifically:a71 H

    6、aving two complete systems allowed the project to take an aggressive approach with respect to ground tests and flight envelope expansion.a71 Upper management approval and support was increased and maintained.a71 Lessons learned from developing vehicle number one could be applied to number two.a71 Th

    7、e overall project milestones could be protected/met by using vehicle number two for spare parts.a71 The decrease in individual vehicle complexity over that of one with built in redundancy Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-decreased main

    8、tenance requirements. Additionally, the approach mentioned above introduced several concerns:a71 Producing two complete systems spread the workforce very thinly, especially when resources between the two efforts were shared and/or had overlapping schedules.a71 Project management in general has a ten

    9、dency to place all the best people on the team dedicated to the primary vehicle, such that the team working on the secondary vehicle suffers from inexperience and does not have the luxury of adequate mentoring/traininga71 The focus on vehicle number one, especially after it entered the flight testin

    10、g phase, at times caused a loss of commitment to vehicle number two and jeopardized its schedule.a71 Risk management and safety efforts must always be supported and incorporated into project planning and should not be de-emphasized because there is a complete backup system. Recommendation(s): When u

    11、sing unmanned flight vehicles in remote unpopulated areas, consider using a cost/schedule optimization and risk reduction approach based on developing two fully functional test vehicles instead of one with extensive sub-system redundancy. This approach should be accompanied with a dedicated effort t

    12、o treat each vehicle as if it were unique and required to serve at any given time. Thus, the secondary vehicle should only be used as a resource to support vehicle number one after other risk mitigation strategies have failed. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Les

    13、son: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Configuration ManagementProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Flight Equipmenta71 Flight Operationsa71 Risk Management/AssessmentAdditional Info: Approval Info: a71 Approval Date: 2002-10-09a71 Approval Name: Anthony Bricenoa71 Approval Organization: ARCa71 Approval Phone Number: 650-605-1012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf)为本站会员(fatcommittee260)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开