欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1285-2002 Lessons Learned Conflicting Requirements From Multiple Management Customer Entities.pdf

    • 资源ID:1018924       资源大小:13.27KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1285-2002 Lessons Learned Conflicting Requirements From Multiple Management Customer Entities.pdf

    1、Lessons Learned Entry: 1285Lesson Info:a71 Lesson Number: 1285a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ K. FreemanSubject: Conflicting Requirements From Multiple Management/Customer Entities Description of Driving Event: Often Programs/projects, especia

    2、lly highly visible ones, must deal with the reality of being accountable to multiple entities, such as Center Senior Staff, Headquarters/ Enterprise Management, External Partner Management (FAA, DOE, NSF, etc.) who may have conflicting requirements. In addition, the Program/project has the main resp

    3、onsibility of fulfilling customer requirements, which may not be entirely compatible with the direction levied by these other “bosses.“ Programs/projects must balance the requirements of these bosses with that of their customers. It is in the best interest of the Program/project if the customer requ

    4、irements take priority over all others.Lesson(s) Learned: Programs/projects facing accountability from multiple management entities must have a senior level official who acts as a buffer and control point between the peripheral “bosses“ and the Program/project. Without this buffer, the Program/proje

    5、ct resources will be spread inefficiently and ineffectively and their focus and momentum to deliver customer requirements will be diluted. This particular Program/project combination minimized the impact of this issue by having the Centers Associate Director for Aerospace Programs as part of their m

    6、anagement and reporting structure. The Program/project had a close working relationship, including weekly meetings, with the Centers Associate Director for Aerospace Programs to identify and discuss issues that required senior level attention and championing. The Centers Associate Director for Aeros

    7、pace Programs acted on behalf of the Program/project in an “up and out“ fashion such that upper/peripheral management support was maximized while its interference was minimized.Recommendation(s): When preparing the Program/project plan, the definition of roles and responsibilities of all parties Pro

    8、vided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-should be carefully defined. The organizational chart should include a senior level Center management official that can protect the Program/projects resources, focus, and requirements from peripheral manag

    9、ement entities. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 Policy & PlanningAdditional Info: Approval Info: a71 Approval Date: 2002-10-09a71 Approval Name: Anthony Bricenoa71 Approval Organization: ARCa71 Approval Phone Number: 650-604-1012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1285-2002 Lessons Learned Conflicting Requirements From Multiple Management Customer Entities.pdf)为本站会员(registerpick115)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开