欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1215-1999 Lessons Learned Human factors considerations for critical hardware lifts.pdf

    • 资源ID:1018854       资源大小:14.54KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1215-1999 Lessons Learned Human factors considerations for critical hardware lifts.pdf

    1、Lessons Learned Entry: 1215Lesson Info:a71 Lesson Number: 1215a71 Lesson Date: 1999-08-30a71 Submitting Organization: JSCa71 Submitted by: Case Van Dyke/ Ronald A. MontagueSubject: Human factors considerations for critical hardware lifts Description of Driving Event: After completion of the rotation

    2、 of the Z-1 truss segment using a cab-operated 30-ton overhead bridge crane, the lifting device down rods were disconnected from the flight hardware. The task leader instructed the crane director on the floor to move the crane hook up to clear the trunnions. The crane director relayed the instructio

    3、ns over walkie-talkie radio to the crane operator in the cab. The crane operator inadvertently commanded the hook to move in the down direction causing the lifting device down rods to make contact with the trunnions on the Z-1 truss. The operation was stopped. After examination by the task team, the

    4、 crane hook was moved up and the crane was placed in the parking area and impounded. There was evidence that all four trunnions received metal-to-metal contact from the down rods. A damage assessment is being conducted. There was no damage to the lifting device or Hydra-Set and no personnel were inj

    5、ured.Root cause: The root cause was determined to be human error caused by a combination of less than optimum design of the crane cab controls; inadequate communications and understanding of hoist speeds; and the failure of the emergency stop-button operator to actuate the emergency stop.Lesson(s) L

    6、earned: Human factors considerations must be considered when planning safety-critical tasksRecommendation(s): Several short-term recommendations were considered to mitigate the mishap recurrence. The crane operating procedure has been modified to include a detail list of crane speeds that are to be

    7、used when operating within close proximity of flight hardware. The pre-task briefing will reinforce the use of the E-Stop (i.e. Emergency Stop) during operations. The operating procedure will be modified Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-

    8、,-to include a list of all crane crew certifications, including those of relief personnel on the crew. Long term recommendations include development of a process to change out the crane crew that have vigilant type duties more often and keeping the crane operator more involved in the task during dwe

    9、ll times. A study of the cranes cab control panel design will also be conducted to optimize Human Engineering Factors. In addition, a dry run should be considered to ensure that the operator is confident to avoid human errors. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Les

    10、son: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Facilitiesa71 Flight Equipmenta71 Flight Operationsa71 Ground Equipmenta71 Ground Operationsa71 Hardwarea71 Human Factorsa71 Industrial Operationsa71 Lifting Devicesa71 Policy & Planninga71 Risk Management/Assessmenta71 Safety & Missio

    11、n AssuranceAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2002-06-17a71 Approval Name: Ronald A. Montaguea71 Approval Organization: JSCa71 Approval Phone Number: 281-483-8576Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1215-1999 Lessons Learned Human factors considerations for critical hardware lifts.pdf)为本站会员(lawfemale396)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开