欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1208--1999 Lessons Learned Use of can-t fail process to reduce chances for operator error.pdf

    • 资源ID:1018847       资源大小:14.99KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1208--1999 Lessons Learned Use of can-t fail process to reduce chances for operator error.pdf

    1、Lessons Learned Entry: 1208Lesson Info:a71 Lesson Number: 1208a71 Lesson Date: 1999-07-23a71 Submitting Organization: JSCa71 Submitted by: Nicholas Gaspar/ Ronald A. MontagueSubject: Use of “cant fail“ process to reduce chances for operator error Description of Driving Event: A functional test was b

    2、eing performed at one of the subcontractors on Pressure Transducers. The physical setup consisted of a supply pressure bottle connected to a pressure manifold (with 4 pressure transducers installed) and to a test console. The objective of the functional test was to ensure that at various pressures t

    3、he pressure transducers were within allowable tolerance. The system was to be pressurized to 400 psi (line pressure), then a 40 psi differential pressure applied to the transducers. a71 The technician applied 15 VDC voltage to the pressure standard. This is below required voltage.a71 Next, he increa

    4、sed the line pressure expecting an indication from the pressure standard. However, as the pressure increased, the input voltage to the pressure standard dropped from 15 VDC to 11 VDC. At 11 VDC the standard is not able to function due to the low voltage and therefore no increase in pressure was indi

    5、cated.a71 The technician had no indication that pressure buildup was exceeding the allowable limit for the transducers.a71 Overpressurization damaged the diaphragms in the pressure transducers.Root cause: Human error.a. Technician applied incorrect input voltage to the pressure standard. As a result

    6、 the pressure standard failed to indicate the actual line pressure.b. Technician failed to limit the source pressure. He failed to set the bottle pressure regulator to 440 psi. This would have ensured that the transducers could not be subjected to a pressure exceeding their proof pressure.c. Contrib

    7、uting Causes: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. Inadequate training in use of test equipment. Although the technician had received on-the-job-training in test procedures and use of lab equipment, the technician was unaware of the haz

    8、ardous consequences should the pressure standard be starved for current.2. Adequate failure tolerance (Cant Fail) was not required to be built into the procedure.3. Required input voltage was not readily available. Since this incident the input voltage requirements for the pressure standard have bee

    9、n added to the calibration sheet with a warning to the technicians. In addition the input voltage requirements have been stenciled, as a warning to technicians, in large red letters, directly to the standard.Lesson(s) Learned: Use of “cant fail“ processes when designing manufacturing, test, and oper

    10、ations can greatly reduce the chances for human errorRecommendation(s): Apply “Cant Fail“ process to each procedure where hardware is handled, machined, installed or tested to ensure that an operator error, equipment failure or software anomaly will not lead to a significant event. Evidence of Recur

    11、rence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Computer-Aided Design/Manufacturing/Engineeringa71 Configuration Managementa71 Flight Equipmenta71 Flight Operationsa71 Ground Equipmen

    12、tProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Ground Operationsa71 Hardwarea71 Human Factorsa71 Industrial Operationsa71 Launch Processa71 Parts Materials & Processesa71 Payloadsa71 Policy & Planninga71 Risk Management/Assessmenta71 Safety & M

    13、ission Assurancea71 Softwarea71 Spacecrafta71 Test & Verificationa71 Test Articlea71 Test FacilityAdditional Info: Approval Info: a71 Approval Date: 2002-06-17a71 Approval Name: Ronald A. Montaguea71 Approval Organization: JSCa71 Approval Phone Number: 281-483-8576Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1208--1999 Lessons Learned Use of can-t fail process to reduce chances for operator error.pdf)为本站会员(ownview251)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开