欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0927-2001 Lessons Learned - KAO (Kuiper Airborne Observatory) Gauge Calibration Problem During Aircraft Pressure Test.pdf

    • 资源ID:1018572       资源大小:12.95KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0927-2001 Lessons Learned - KAO (Kuiper Airborne Observatory) Gauge Calibration Problem During Aircraft Pressure Test.pdf

    1、Lessons Learned Entry: 0927Lesson Info:a71 Lesson Number: 0927a71 Lesson Date: 2001-02-22a71 Submitting Organization: ARCa71 Submitted by: Chuck Connors, Sr.Subject: KAO (Kuiper Airborne Observatory) Gauge Calibration Problem During Aircraft Pressure Test Description of Driving Event: During the pre

    2、-modification pressure test, the contractor had a difficult time in reaching the full pressure test value. The clam shell doors were open and the aft seals around the door were inverted and letting air escape. The contractor was preparing to get additional compressors when it was noticed that the sk

    3、in of the aircraft appeared to be bowed. The test was immediately halted and NASA requested that the pressure gauges be checked for proper calibration. The contractor discovered that the gauges were out of calibration and were reading a lower pressure and it was determined that they had actually rea

    4、ched the full test pressure value and even exceeded this value.Lesson(s) Learned: Make sure gauges are calibrated and that there is documentation to substantiate successful calibration prior to the start of the test.Recommendation(s): Both NASA and the contractor worked very hard to substantiate tha

    5、t no structural damage had occurred. This task was successful but it took quite an effort at a very busy time in the program. To avoid a similar incident like this one, it is recommended that successful calibration of the gauges be checked and to provide a relief valve in the pressurization system t

    6、hat will protect the aircraft from being overpressurized.Evidence of Recurrence Control Effectiveness: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Documents Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Aeronautics R

    7、esearchAdditional Key Phrase(s): a71 Aircrafta71 Ground Operationsa71 Ground Equipmenta71 Hardwarea71 Pressure Vesselsa71 Test Facilitya71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 2001-03-05a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0927-2001 Lessons Learned - KAO (Kuiper Airborne Observatory) Gauge Calibration Problem During Aircraft Pressure Test.pdf)为本站会员(hopesteam270)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开