欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0919-2000 Lessons Learned Principal Investigator (PI) Mode Contingency Funding.pdf

    • 资源ID:1018564       资源大小:13.54KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0919-2000 Lessons Learned Principal Investigator (PI) Mode Contingency Funding.pdf

    1、Lessons Learned Entry: 0919Lesson Info:a71 Lesson Number: 0919a71 Lesson Date: 2000-09-13a71 Submitting Organization: GSFCa71 Submitted by: Bill OchsSubject: Principal Investigator (PI) Mode Contingency Funding Description of Driving Event: The Solar Radiation and Climate Experiment (SORCE) Project

    2、is a PI Mode cost capped mission. During the formation of the SORCE Mission (which is a combination of the Solar/Stellar Irradiance Comparison Experiment (SOLSTICE) and the Total Solar Irradiance Mission (TSIM), two decisions were made with regards to contingency funding. First, unlike most PI Mode

    3、missions in which the PI holds all the contingency funding, it was determined that the GSFC Mission Manager would hold a small amount of contingency. Secondly, as in the past with other PI Mode Missions the total amount of contingency would be approximately 15%. For the SORCE Mission, the PI held ap

    4、proximately 13% and the GSFC Mission Manager held about 5%. During the Implementation Phase of the mission, new requirements have been levied on the project with regards to acceptable risk, risk mitigation, and Software Independent Verification and Validation (IV&V). Additionally, potential changes

    5、at KSC with regards to commercialization of payload processing facilities and changes to the payload/launch vehicle integration process (driven by concerns of both GSFC project management and the PI) are also forthcoming. The new requirements and changes are threatening to deplete both the contingen

    6、cy funds being held by the GSFC Mission Manager and the Mission unique funds held at KSC.Lesson(s) Learned: The first lesson learned from this event is that having the Mission Manager hold a certain amount of contingency funding at the project level and not by the PI is a definite positive. These co

    7、ntingency funds can be used to mitigate risks that are beyond the control of the project. Examples of these risks include new requirements that are out of scope of the contract with the PI, provide funding for up to a 30 day launch delay if the launch services providers funds have been expended for

    8、other unforeseen circumstances, problems in observatory level Integration and Test (I&T) for which the PI may not be able to support with his/hers contingency, etc. The second lesson learned is that the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,

    9、-amount of contingency funding held by the PI of approximately 15% is sufficient, but given the current environment regarding risk, the amount of contingency held by the GSFC Mission Manager is not enough.Recommendation(s): First, for future PI Mode missions, the GSFC Mission Manager should hold a c

    10、ertain amount of contingency reserve at GSFC under his/her control. Second, the amount of contingency held at the beginning of the Implementation Phase by the PI should remain at approximately 15%, but the contingency held by the GSFC Mission Manager should be approximately 10%. This will bring the

    11、total amount of contingency funding available to the project to 25%.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 ScienceAdditional Key Phrase(s): a71 Financial Managementa71 Policy & Planninga71 Procurement, Small Business & Industrial Relationsa71 SpacecraftAdditional Info: Approval Info: a71 Approval Date: 2000-10-23a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0919-2000 Lessons Learned Principal Investigator (PI) Mode Contingency Funding.pdf)为本站会员(ownview251)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开