欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0871-2000 Lessons Learned Safety Precautions in Operational Procedures.pdf

    • 资源ID:1018517       资源大小:14.79KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0871-2000 Lessons Learned Safety Precautions in Operational Procedures.pdf

    1、Lessons Learned Entry: 0871Lesson Info:a71 Lesson Number: 0871a71 Lesson Date: 2000-03-06a71 Submitting Organization: JSCa71 Submitted by: Larry GreggSubject: Safety Precautions in Operational Procedures Description of Driving Event: On January 4, 1995, at approximately 8:50 a.m., two technicians at

    2、 WSTF were overcome and collapsed from breathing in an oxygen deficient atmosphere that formed during shutdown operations following a transfer of liquid nitrogen (LN2) from a vendor supply tanker to a WSTF storage tanker. This transfer operation was normally controlled by monitoring a tanker vent li

    3、ne. Flow from this vent line indicated the tank was full, and the operation was suspended. There is also a liquid level indicator and a pressure gage on the WSTF tanker for monitoring purposes.On the morning of the mishap, conditions (high humidity and still air) existed which caused a larger than n

    4、ormal water vapor cloud to form during continuous venting of cold gaseous nitrogen (GN2) during the filling operation. This venting is required to keep the WSTF tanker at a lower pressure than the vendor tanker during the fill operation. The cloud prevented the normal visual monitoring of the vent l

    5、ine, the liquid level indicator, and the pressure gauge. The technicians, instead of positioning themselves to be able to monitor the vent line and gauges, located approximately 30 feet away from the tanker to both remove themselves from the heavy vapor cloud and also to remain out of the rain. Duri

    6、ng the operation, the technicians would periodically approach the tankers to monitor the liquid level indicator and the pressure gauge. The vent line was never observed due to being obscured by the vapor cloud. After about 50 minutes, the weather got worse and the technicians decided to suspend the

    7、operation due to weather and because they thought the tanker was nearly full. Data collected later showed that the tanker was completely full, and that LN2 was being released through the vent line instead of GN2. As the first technician attempted to close the vent and transfer valves, he was overcom

    8、e and collapsed due to the lack of oxygen. The second technician, who was monitoring the activity, also was overcome and collapsed due to the lack of oxygen. A few moments later, vendor personnel approached and eventually remove both technicians from the area. Later investigation indicated that LN2

    9、flow from the vent line coupled with adverse weather conditions created an oxygen deficient atmosphere in the area.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lesson(s) Learned: All credible unsafe conditions that may be encountered during the ac

    10、complishment of normal operating procedures must be anticipated, and alternate methods of action identified and included as appropriate.Recommendation(s): Analyze operating procedures for credible hazards and/or environments that may create unsafe conditions. Provide alternate methods of procedure a

    11、ccomplishment to address these conditions and maintain operator safety during them.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Cryogenic Syste

    12、msa71 Emergency Preparednessa71 Environmenta71 Facilitiesa71 Ground Operationsa71 Hazardous/Toxic Waste/Materialsa71 Human Factorsa71 Logisticsa71 Packaging Handling Storagea71 Personal Protective Equipmenta71 Policy & Planninga71 Risk Management/Assessmenta71 Safety & Mission AssuranceProvided by I

    13、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Test Facilitya71 TransportationAdditional Info: Approval Info: a71 Approval Date: 2000-04-11a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0871-2000 Lessons Learned Safety Precautions in Operational Procedures.pdf)为本站会员(孙刚)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开