欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0584-1998 Lessons Learned Mars Global Surveyor (MGS) Aerobraking Extra Burn Anomaly (1997).pdf

    • 资源ID:1018231       资源大小:17.10KB        全文页数:4页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0584-1998 Lessons Learned Mars Global Surveyor (MGS) Aerobraking Extra Burn Anomaly (1997).pdf

    1、Lessons Learned Entry: 0584Lesson Info:a71 Lesson Number: 0584a71 Lesson Date: 1998-03-05a71 Submitting Organization: JPLa71 Submitted by: C. Whetsel/D. OberhettingerSubject: Mars Global Surveyor (MGS) Aerobraking Extra Burn Anomaly (1997) Abstract: Following Mars encounter, an unintended repetition

    2、 of MGSs Aerobraking Maneuver #5 occurred after the intentional burn. Installation of a new version of the ground data system software one day earlier than planned without adequate review of the consequences of the schedule change caused an incompatibility between ground and flight software.Configur

    3、ation control procedures must ensure that the spacecraft and sequence teams are properly notified of changes to planned ground software updates affecting the spacecraft. In particular, uplink sequences must be consistent with memory partitions onboard the spacecraft. Description of Driving Event: Mi

    4、ssions using aerobraking employ atmospheric drag to reduce the spacecraft orbit period and lower its apoapsis altitude. The technique requires tight control both on the attitude pointing of the spacecraft while in the atmosphere, and especially on the altitude during each aerobraking drag pass at pe

    5、riapsis (the orbits closest approach to the planet). Targeting periapsis altitudes is critical to assure that the proper orbital conditions are achieved. The periapsis altitude is controlled by periodically performing small propulsive aerobraking trim Provided by IHSNot for ResaleNo reproduction or

    6、networking permitted without license from IHS-,-,-maneuvers (ABMs) one-half of the orbit period earlier. This places the spacecraft at the other side of the orbit, near apoapsis, the point in an orbit at which the spacecraft is at furthest distance from the planet. A portion of the Mars Global Surve

    7、yor (MGS) spacecraft memory was allocated and managed as storage space for command sequences and programs uplinked from Earth, such as aerobraking maneuvers. These sequence loads are typically created by the flight projects sequence team with inputs from the spacecraft and science operations teams.E

    8、xtra Burn Anomaly. An unintended repetition of MGS Aerobraking Maneuver #5 occurred after the intentional burn on November 12, 1997. The planned maneuvers objective was to decelerate the spacecraft 0.1 meters per second (m/s) to enable an aerobraking pass 17 hours later. This maneuver executed as ex

    9、pected.refer to D descriptionD Aerobraking Operations Approximately 3 hours later, the spacecraft unexpectedly repeated the aerobraking maneuver, imparting an additional delta-v to the spacecraft. To avoid a deeper penetration into the Martian atmosphere, the flight team designed, uploaded, and succ

    10、essfully commanded a third “antidote“ maneuver, which counteracted the effect of the unplanned second maneuver. Although the mission impact of this incident was limited to expenditure of propellant in the 0.5 m/s remedial burn, occurrence at another time could have been mission catastrophic.The caus

    11、e of the incident was traced to an incompatibility between ground and flight software. A new version of the ground software had been installed in the ground data system one day earlier than planned without adequate review of the consequences of the schedule change. This new software had been redesig

    12、ned to improve programming and command efficiency. Certain memory partitions were reassigned in on-board memory, and this software package needed to be installed on the ground system at the previously agreed to time relative to the command uploads. Due to the address changes, the recently executed A

    13、erobraking Maneuver #5 was loaded into the partition originally intended for the next science sequence. Hence, when the spacecraft command data subsystem (CDS) executed Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-“Next Sequence,“ the Aerobraking

    14、Maneuver #5 sequence was still present in memory, and it was performed instead of the science sequence.Reference(s): JPL Incident/Surprise/Anomaly (ISA) Number Z44658, November 23, 1997Lesson(s) Learned: Configuration control procedures must ensure that the spacecraft and sequence teams are properly

    15、 notified of changes to planned ground software updates affecting the spacecraft. In particular, uplink sequences must be consistent with memory partitions onboard the spacecraft.Recommendation(s): 1. Prior to implementing any change in command and control software, verify that the configurations of

    16、 ground and flight software are compatible.2. Provide a method for identifying the time-criticality of any flight software configuration change.3. When approved mission plans must be changed in real time, review and reconsider all factors which were weighed in developing the original plan.4. Softwar

    17、e design and implementation should minimize the possibility of accessing onboard stored command sequences at inappropriate times.5. Development and use of flight and ground software should be closely coordinated from the very beginning and throughout the life of the project.Evidence of Recurrence Co

    18、ntrol Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Configuration Managementa71 SoftwareProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 1998-03-13a71 Approval Name: Carol Dumaina71 Approval Organization: JPLa71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0584-1998 Lessons Learned Mars Global Surveyor (MGS) Aerobraking Extra Burn Anomaly (1997).pdf)为本站会员(孙刚)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开