欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0583-1998 Lessons Learned Test Contingency Planning Should Consider Facility Power Interruptions (1996).pdf

    • 资源ID:1018230       资源大小:15KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0583-1998 Lessons Learned Test Contingency Planning Should Consider Facility Power Interruptions (1996).pdf

    1、Lessons Learned Entry: 0583Lesson Info:a71 Lesson Number: 0583a71 Lesson Date: 1998-02-19a71 Submitting Organization: JPLa71 Submitted by: K. Clark/D. OberhettingerSubject: Test Contingency Planning Should Consider Facility Power Interruptions (1996) Abstract: During a regional public service power

    2、outage, an unplanned facility power loss occurred during system level thermal-vacuum test of the Mars Global Surveyor. This resulted in a slight inflow of external unfiltered air into the propulsion system through its Ground Support Equipment (GSE) pressure control system - a potential contamination

    3、 concern. Test contingency plans and FMEAs for ground support equipment should consider responses to facility power interruptions. Test facilities should have devices to maintain a safe spacecraft environment in the event of a facility power loss.Description of Driving Event: Propulsion systems are

    4、normally kept at a net positive pressure. During a regional public service power outage, an unplanned facility power loss occurred during system level thermal-vacuum test of the Mars Global Surveyor (MGS). This resulted in a slight inflow of external unfiltered air into the propulsion system through

    5、 its Ground Support Equipment (GSE) pressure control system - a potential contamination concern. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionD MGS Prepared in Vacuum Chamber for System-Level Testing Examination of the propul

    6、sion test equipment GSE revealed that an open port on its vacuum pump relief valve allowed a small amount of room air back through its cold trap. Had a separate GSE solenoid valve been included immediately downstream of this vacuum pump, the propulsion system would have been safe in the event of tot

    7、al facility power failure. Because the backflow rate into the propulsion system was small and the cold trap temperature was not compromised, there was little concern for contamination. Gas sampling confirmed that there had been no significant contamination of flight hardware. Backup power was restor

    8、ed within one minute, and the system resumed operation as designed.Reference(s): Problem/Failure Report No. B0PE10Lesson(s) Learned: Unplanned power interruptions during thermal-vacuum test may cause air backflow and possible contamination and/or damage of flight hardware.Recommendation(s): 1. Consi

    9、der appropriate responses to facility power interruptions when developing test contingency plans and failure mode and effects analyses (FMEAs) for ground support equipment.2. Consider equipping test facilities with GSE devices which maintain a safe spacecraft environment in the event of facility pow

    10、er loss.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Energya71 Test & Verificationa71 Test FacilityAdditional Info: Approval Info: a71 Approval Date: 1998-03-03a71 Approval Name: Carol Dumaina71 Approval Organization: JPLa71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0583-1998 Lessons Learned Test Contingency Planning Should Consider Facility Power Interruptions (1996).pdf)为本站会员(周芸)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开