欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0420-1996 Lessons Learned VO-75 Pressure Regulator Leakage and Work-Around Procedures (~1976).pdf

    • 资源ID:1018067       资源大小:14.68KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0420-1996 Lessons Learned VO-75 Pressure Regulator Leakage and Work-Around Procedures (~1976).pdf

    1、Lessons Learned Entry: 0420Lesson Info:a71 Lesson Number: 0420a71 Lesson Date: 1996-07-08a71 Submitting Organization: JPLa71 Submitted by: J.A. RobertsSubject: VO75 Pressure Regulator Leakage and Work-Around Procedures (1976) Abstract: The pressure regulator in the Viking Orbiter Propulsion Subsyste

    2、m started leaking following a pyro firing that occurred prior to the near-Mars TCM. Likely causes were corrosion or residue from propellant migration or pyro valve blowby, or particulate contamination. Recommendations included using separate regulators for the fuel and oxidizer sides, incorporating

    3、a bellows in the pyro valve to eliminate blowby, and adding a isolation valve between the regulator and propellant tank.Description of Driving Event: (Relevant Historical Lesson(s) Learned)The pressure regulator in the Viking Orbiter-1 (VO-1) Propulsion Subsystem, after having performed without inci

    4、dent through the completion of the near-Earth midcourse Trajectory Correction Maneuver (TCM), leaked when 265 days later it was brought back on-line by the opening of an explosive valve which had isolated the regulator and propellant tanks from the pressurant tanks through the coast period prior to

    5、the near-Mars Trajectory Correction Maneuver. The regulator leakage was detected by virtue of a continual rise in the fuel and oxidizer tank pressures. Propellant tank pressure data show that the regulator had been leak-tight up to the end of the near-Earth Trajectory Correction Maneuver, when the p

    6、ressurant isolation pyro valve was actuated closed.The near-Mars TCM burn duration was lengthened considerably and an additional unscheduled TCM made. This relieved pressure and increased ullage. After Mars Orbit Insertion (MOI) the regulator was valved off from the pressurant supply. It was elected

    7、 not to isolate the regulator immediately, then re-open for MOI.The VO-2 approach sequence was also revised, but differently. The pressurant supply was left Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-isolated until MOI, the TCM being made in “bl

    8、ow down“ mode.An analysis of telemetry data ruled out: a scratch in the regulator poppet or seat, and housing weld failure. Remaining possibilities are: 1) corrosion and/or residue formation in the regulator circuit - due to propellant migration and/or pyro valve blowby, and 2) particulate contamina

    9、tion.Additional Keyword(s): Material Compatibility, Propellant Feed SystemReference(s): IOM 344S-76-258, September 14, 1976, “Pressure Regulator Failure Analysis, VO75 Propulsion Subsystem, PFR 35408,“ G. Yankura to F. C. VoteLesson(s) Learned: The micro-scale effects of long-term propellant exposur

    10、e should be investigated in order to better critique regulator design.Recommendation(s): Design corrective measures of propulsion pressurization subsystems which should be considered are:1. using separate regulators for the fuel and oxidizer sides2. incorporating a bellows in the pyro valve to elimi

    11、nate blowby3. adding a isolation valve between the regulator and propellant tank to minimize propellant migration into the regulatorEvidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Energetic Materials - Explosiv

    12、e/Propellant/Pyrotechnica71 Pressure VesselsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 1996-04-04a71 Approval Name: Carol Dumaina71 Approval Organization: JPLa71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0420-1996 Lessons Learned VO-75 Pressure Regulator Leakage and Work-Around Procedures (~1976).pdf)为本站会员(registerpick115)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开