欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0371--1995 Lessons Learned - SEASAT Failure.pdf

    • 资源ID:1018018       资源大小:14.62KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0371--1995 Lessons Learned - SEASAT Failure.pdf

    1、Lessons Learned Entry: 0371Lesson Info:a71 Lesson Number: 0371a71 Lesson Date: 1995-01-24a71 Submitting Organization: JPLa71 Submitted by: R.F. CollinsSubject: SEASAT Failure Abstract: The SEASAT Spacecraft failed in orbit due to arcing between adjacent slip ring brush assemblies. It was discovered

    2、that the Agena bus had been substantially modified, but were treated as a heritage design not requiring requalification. Plans should be made early in the project to fully evaluate the heritage of previously used equipment. When conducting a FMECA on electrical components, electrical short failure m

    3、odes should be considered.Description of Driving Event: The SEASAT Spacecraft failed in orbit due to a massive and progressive short in the slip ring assembly connecting the rotating solar array to the power subsystem. The most probable cause of this short was the initiation of an arc between adjace

    4、nt slip ring brush assemblies. The slip ring assembly was connected into the power system such that the adjacent brush assemblies were of opposite polarity, an arrangement particularly prone to shorting. The SEASAT prime contractor was aware of instances of slip ring failures due to shorting on othe

    5、r projects, but did not communicate this information to the SEASAT project office. This lack of communication may have been the result of the classified nature of the other projects. The failure to give the slip ring assembly the attention it deserved was rooted in the contract structure and the SEA

    6、SAT implementation policy. SEASAT was a dual contract; a fixed price for the Agena bus containing flight proven subsystems and a cost-plus award fee for the payload module which was integrated with the Agena bus. By contract, implementation plan, and resource constraints, JPL had no significant over

    7、sight of the Agena bus. The failure review board established that the Agena power, attitude control, and data subsystems were substantially modified, but were treated as closely similar designs not requiring requalification. This consideration of the Agena bus as flight-proven standard equipment led

    8、 to the failure to report significant component failures, waiving tests and weak compliance with specifications. In addition, the Failure Mode Effects and Criticality Analysis (FMECA) conducted on the power system did not Provided by IHSNot for ResaleNo reproduction or networking permitted without l

    9、icense from IHS-,-,-consider shorts as a potential failure mode.Additional Keyword(s): Inherited Equipment, Slip RingsLesson(s) Learned: 1. “Heritage“ hardware designs, previously flown on prior missions, can still contain design errors.2. Consideration of electrical shorts as a potential failure mo

    10、de during FMECA of the power system is of critical importance.Recommendation(s): 1. The uncritical acceptance of equipment that has been classified as “standard“ or “flight proven“ should be avoided, especially if modifications of any level have been made on this equipment. Plans should be made earl

    11、y in the project to fully evaluate the heritage of previously used equipment. The degree of evaluation may have to be contractually defined on fixed-price contracts.2. When conducting a FMECA on the power system and other electrical components, electrical shorts should be considered as one of the po

    12、tential failure modes.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 HardwareAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 1988-10-05a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0371--1995 Lessons Learned - SEASAT Failure.pdf)为本站会员(appealoxygen216)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开