REG NASA-LLIS-0085-1992 Lessons Learned - Lifting Portable Purge Units.pdf
-
资源ID:1017739
资源大小:12.52KB
全文页数:2页
- 资源格式: PDF
下载积分:10000积分
快捷下载

账号登录下载
微信登录下载
下载资源需要10000积分(如需开发票,请勿充值!)
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
REG NASA-LLIS-0085-1992 Lessons Learned - Lifting Portable Purge Units.pdf
1、Lessons Learned Entry: 0085Lesson Info:a71 Lesson Number: 0085a71 Lesson Date: 1992-05-08a71 Submitting Organization: KSCa71 Submitted by: David PenningtonSubject: Lifting Portable Purge Units Description of Driving Event: The portable purge units are lifted on and off the MLP. The existing lifting
2、sling design induces stress into the units operating components and overstresses the units lift points. Cracks are present on the lifting lug plates and elongation of the lifting lug holes has occurred. Failure of these components could result in damage to ground support equipment (GSE).Lesson(s) Le
3、arned: Lifting portable purge units (PPU) has caused cracks and damage to operating components which result in damage to an orbiter system.Recommendation(s): Redesign lifting sling mechanism to prevent stress from being applied to the PPUs operating components during lifting operations.Evidence of R
4、ecurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/AAdditional Key Phrase(s): a71 Facilitiesa71 Ground Operationsa71 Ground Equipmenta71 Hardwarea71 Lifting DevicesAdditional Info: Approval Info: a71 Approval Date: 1994-06-02a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-