1、 Errata NFPA 58 Liquefied Petroleum Gas Code2017 Edition Reference: Table 5.9.4.1(B), 11.4.1.16; and Table 16.1(i), Table Note 3 Errata No: 58-17-1 The Technical Committee on the Liquefied Petroleum Gas Code notes the following errors in the 2017 edition of NFPA 58, Liquefied Petroleum Gas Code. 1.
2、Update the references in Table 5.9.4.1(B) to read as follows: Table 5.9.4.1(B) Container Connection and Appurtenance Requirements for Containers Used in Other Than Bulk Plants and Industrial Plants Part Appurtenance 1 2 3 420 lb Propane Capacity (except DOT Spec. 39) Stationary ASME Containers 4000
3、gal Water CapacityaDOT and ASME Engine Fuel and Mobile Containers A Vapor shutoff valvebR (CGA 555 outlet prohibited) R R With internal excess-flow valve B Liquid shutoff valvebR With CGA 555 outlet and internal excess-flow valve R With internal excess flow valve R With internal excess-flow valve C
4、Pressure relief valve R (See 5.9.2.2.) RcSee 5.9.4.1(A). R With full internal or flush-type full internal pressure relief valve D Fixed maximum liquid level gauge R (filled by volume) R (filled by weight, 40 lb and 100 lb) R See 5.9.4.1(C)(10).R (ASME only) See 5.9.4.1(C)(6).E Overfilling prevention
5、 device R (4 lb through 40 lb) (See 5.9.3.) NR R (ASME only) See 5.9.4.1(C)(6). F Actuated liquid withdrawal excess-flow valve NR R (125 gal) See 5.9.4.1(C)(3), (4), and (5). NR G Float gauge NR R (124 gal only) NR H Filler valve See 5.9.4.1(C)(7). R (100 lb cylinders that are filled on site at the
6、point of use) R R (ASME containers only) For SI units, 1 lb = 0.454 kg; 1 gal = 0.0045 m3. R: Required. NR: Not required. aAll ASME container capacities are water capacity. bWhere installed. cAboveground ASME containers, internal spring-type pressure relief valves may be used, see 5.9.4.1(A), 5.9.4.
7、1(B), and 5.9.4.1(C). 2. Update the references in paragraph 11.4.1.16 to read as follows: 11.4.1.16 Where an overfilling prevention device is installed on the ASME container or exterior of the compartment and remote filling is used, a filler valve complying with 5.9.4.1(C)(7)(a) or (b) shall be inst
8、alled in the exterior fill opening, and a filler valve complying with 5.9.4.1(C)(7)(c) shall be installed in the container filler valve opening. 3. Correct the spelling of “increase” in Table 16.1(i), Table Note 3. Issue Date: November 28, 2016 (Note: Electronic products and pamphlet reprints may have this errata incorporated. For current information about the NFPA Codes and Standards, including this errata, please see www.nfpa.org/docinfo) Copyright 2016 All Rights Reserved NATIONAL FIRE PROTECTION ASSOCIATION